长期优化调度 Resources

Showing items tagged with "长期优化调度"

Long-term optimal dispatch for hydropower stations aims to maximize total power generation over the scheduling period by rationally allocating monthly power discharge flows, while satisfying power system output requirements and downstream comprehensive water usage demands. This involves optimizing water resource utilization under given conditions including forecasted inflow hydrographs, downstream water demand curves, initial and terminal reservoir water levels. The implementation typically employs optimization algorithms like dynamic programming or genetic algorithms to solve the constrained maximization problem, where objective functions calculate energy output based on hydraulic relationships and system constraints.

MATLAB 257 views Tagged